Jiabo Lu bio photo

English CV

Chinese CV

Email

WeChat

Google Scholar

ResearchGate

ORCiD

Github

CSDN

Twitter

LinkedIn

Bilibili

Zhihu

Douban

TikTok

Xiaohongshu

Update:2024/09/22   中文版本 (Chinese Version)

Research

  • Aug 2024 - Sept 2024, conduct Study of floodplain velocity field reconstruction
  • July 2024 - Aug 2024 Conduct Study of empirical orthogonal decomposition methods for flood inundation surrogate models
  • Oct 2023 - Jun 2024 , Conducted Comparative Gaussian Process Kernel for Flood Inundation Prediction LSG Models Study
  • April 2024 - May 2024, wrote the application form for the 2024 National Natural Science Foundation of China (NSFC) Joint Research Fund for Yellow River Water Science Intelligent Flood Prevention and Control in the Middle Reach of the Yellow River Based on Multi-dimensional Perception Topic III Intelligent Flood Prevention and Control in the Middle Reach of the Yellow River Based on Multi-dimensional Perception.
  • June 2024 - July 2024 , to write the 2024 Open Fund of Key Laboratory of Water and Drought Hazard Defense, Ministry of Water Resources Coupling Physical Mechanisms and Artificial Intelligence for Flood or Drought Prediction and Forecasting Research Direction of **Coupling Machine Learning and Physical Mechanisms for Flood Refinement and Efficient Simulation Research **Project Application
  • June 2022, participated in the fourth “Academic WE Salon” of the College of Hydrology and Water Resources, Hohai University, with the title of “Research on the calculation method of the over-gate flow of the control gates of the central line of the South-to-North Water Diversion”, studied the construction of a one-dimensional hydrodynamic coupled model, and used the calculation method of gate outlet flow and the topographic generalization method of weir flow to carry out an example study in the main canal of the central line. Coupled model, using the gate hole outflow calculation method and weir flow terrain generalization method, in the main canal of the central line to carry out case studies.

Project

  • 2021.12 - 2023.11, Development of river network hydrodynamic forecasting subsystem.
  • 2022.08 - 2023.10, Intelligent flood control forecast and operation system of Wangying Reservoir.
  • 2021.03 - 2023.09, Hangzhou informatization dispatching model.
  • 2022.09 - 2024.05, Development of river basin flow and urban flood evolution models.
  • 2022.06 - 2023.09, Yixing City Flood Risk Map System.

Competition

Services

Journal Reviewer

Campus Services

  • 2016.09 - 2020.06, Class life committee member.
  • 2017.06 - 2018.06, Director of the Media Department of the Association for Traceability and Protection of the Mother River, Excellent Minister.
  • 2017.06 - 2018.06, President of OPPO Club.

Practice